Allow EBAZ4205 to be built on hydra.

If there is a way to run this through https://nixbld.m-labs.hk/ before merging that would be ideal as I was only able to test locally and didn't see a way to build all the packages simultaneously.

Allow EBAZ4205 to be built on hydra. If there is a way to run this through https://nixbld.m-labs.hk/ before merging that would be ideal as I was only able to test locally and didn't see a way to build all the packages simultaneously.
newell added 3 commits 2024-10-08 07:11:56 +08:00
Owner

You can test simply with "nix build .#hydraJobs.xxx" and without Hydra. This is just what Hydra runs behind the scenes.

If the EBAZ port takes off, most likely there will be variants. So I would simply make the gateware builder accept one variant instead of dismantling the flake variant handling code as you did here.

You can test simply with "nix build .#hydraJobs.xxx" and without Hydra. This is just what Hydra runs behind the scenes. If the EBAZ port takes off, most likely there will be variants. So I would simply make the gateware builder accept one variant instead of dismantling the flake variant handling code as you did here.
newell changed title from ebaz4205-hydra to WIP: ebaz4205-hydra 2024-10-08 09:16:13 +08:00
newell added 1 commit 2024-10-08 11:32:24 +08:00
newell changed title from WIP: ebaz4205-hydra to ebaz4205-hydra 2024-10-08 11:32:33 +08:00
sb10q merged commit 61df939c87 into master 2024-10-08 11:35:31 +08:00
Sign in to join this conversation.
No reviewers
No Milestone
No Assignees
2 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: M-Labs/artiq-zynq#330
No description provided.